You are currently viewing Kleinwater College

Kleinwater College

The water treatment plant was designed based on the water results Pure Care received from the client. This system was installed in May 2024 to be used for potable purposes. The project took 8 days to be completed. The treated water met SANS 241 standards.

About the Water Treatment System

The system was designed based on water sample results to process enough water that the sump can produce. The filtration system comprises of media filtration, micron filtration, activated carbon, chlorine, and pH dosing. The system is fully automated.

Benefits

Benefits the entire college’s access to clean and potable water.